VR
Project

oil pipeline project

2024-05-24
standard:ASTM
Surface :1. Galvanized 2. Black and Color Painting
introduction
Related Projects
Related Products
Inquiry
introduction
Supply of pipes and fittings to Germany's leading oil and gas producer
Technical difficulty: It is necessary to measure the drilling depth to design different sizes to save drilling time and increase installation speed.
Technical solution: Three different sizes were designed. At 1,200 meters, the 16-inch rope is set at a depth of 1,120 meters, while the 13 3/8-inch rope is set at a depth of 3,495 meters.  To speed up operations and save time on the rig, the 13 3/8” pipe is mounted in brackets (double), increasing installation speed.
Related Products
Related Projects
Oil transportation
2024-06-26 14:18:33
Oil transportation
standard:ASTM
Surface :1. Galvanized 2. Black and Color Painting
Nigeria Natural Gas Pipeline Project
2024-08-01 10:04:58
Nigeria Natural Gas Pipeline Project
standard:ASTM
Surface :1. Galvanized 2. Black and Color Painting
Kazakhstan Oil Field Projects
2024-08-07 10:22:02
Kazakhstan Oil Field Projects
standard:ASTM
Surface :1. Galvanized 2. Black and Color Painting
Inquiry
Copyright © Gnee Steel (tianjin) Co., Ltd All Rights Reserved.
Support: Coverweb