VR
products
SCAFFOLDING PIPE
STEEL SCAFFOLDING PIPE
SCAFFOLDING STEEL PIPE
SCAFFOLDING PIPES
SCAFFOLDING PIPE
STEEL SCAFFOLDING PIPE
SCAFFOLDING STEEL PIPE
SCAFFOLDING PIPES

SCAFFOLDING PIPE

Scaffolding, also called scaffold or staging,[1] is a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings, bridges and all other man made structures.
Delivery:Within 30 days and Depends on your order quantity.
Payment:TT, LC , OA , D/P
Product Introduction
Technical data
Related Products
Service
Related Projects
Inquiry
Product Introduction
Keywords(pipe type):Scaffolding Tube, GI Pipe, Scaffolding Pipe, Galvanized Scaffolding Pipe
Size:OD:38.1mm/42.3mm/48.3mm/48.6mm;WT:2.0mm/2.5mm/2.75mm/3.0mm/3.25mm/3.85mm/4.0mm;LENGTH: 0.3mtr ~ 18mtr
Standard & Grade:GB 15831, EN 39, EN 10219, BS 1139, BS 1387-1985, JIS G 3444
Ends:Square Cut, Plain End, Burr Removed
Delivery:Within 30 days and Depends on your order quantity.
Payment:TT, LC , OA , D/P
Packing:Bundle or bulk , seaworthy packing or for the client's requirement
Usage:Bundles with strips, Waterproof Paper Wrapped or as clients requirement
Description
Scaffolding, also called scaffold or staging,[1] is a temporary structure used to support a work crew and materials to aid in the construction, maintenance and repair of buildings, bridges and all other man made structures. Scaffolds are widely used on site to get access to heights and areas that would be otherwise hard to get to.[2] Unsafe scaffolding has the potential to result in death or serious injury. Scaffolding is also used in adapted forms for formwork and shoring, grandstand seating, concert stages, access/viewing towers, exhibition stands, ski ramps, half pipes and art projects.

There are five main types of scaffolding used worldwide today. These are Tube and Coupler (fitting) components, prefabricated modular system scaffold components, H-frame / facade modular system scaffolds, timber scaffolds and bamboo scaffolds (particularly in China). Each type is made from several components which often include:

A base jack or plate which is a load-bearing base for the scaffold.

The standard, the upright component with connector joins.

The ledger, a horizontal brace.

The transom, a horizontal cross-section load-bearing component which holds the batten, board, or decking unit.

Brace diagonal and/or cross section bracing component.

Batten or board decking component used to make the working platform.

Coupler, a fitting used to join components together.

Scaffold tie, used to tie in the scaffold to structures.

Brackets, used to extend the width of working platforms.

Specialized components used to aid in their use as a temporary structure often include heavy duty load bearing transoms, ladders or stairway units for the ingress and egress of the scaffold, beams ladder/unit types used to span obstacles and rubbish chutes used to remove unwanted materials from the scaffold or construction project.
 
Color silver , blue , gery , yellow , black or customized is available
Certification SGS, CE  , TUV
 Scaffolding type Double width uprightness climb ladder scaffolding  , size : 1.35(L)*2(D)m
Double width ladder scaffolding , size : 1.35(L)*2(D)m
Single width uprightness climb ladder scaffolding , size : 0.75(L)*2(D)m
Scaffolding height  from 2m to 40m
Carrying capacity each plank max 272kg
Main tube  50*5mm , 50*4mm , 50*3mm , 50*2mm
 Scaffolding Components  5 rung D/W laddaspsn frame , 5 D/W laddaspsn frame , 4 rung D/W laddaspsn frame , 4 D/W laddaspsn frame , 3 rung D/W laddaspsn frame , 3 D/W laddaspsn frame , Trapdoor platforms , plain platforms , Diagonal braces , Horizontal braces , Caster and adjustable  leg . Diagonal ladder . Skirking board , Stabilizer
Purpose  Boiler , ASM-Aircrafts , Buildung Servicing and Maintenance . Suitable for all kinds of aerial work
Packing  wrapped in Bubble Bag & Export pallet ,extra packaging is available on request.
 Shipping method  By DHL ,UPS,TNT ,Fedex ,Air or sea depends on the quantity.
Technical data
Specification
 The Standards(Verticals)
Code Length(mm) Tube Thickness(mm) Tube Diameter(mm) Surface Treatment
RS-S-3000 3000 3/3.25 48 HDG/Powder coated
RS-S-2500 2500 3/3.25 48 HDG/Powder coated
RS-S-2000 2000 3/3.25 48 HDG/Powder coated
RS-S-1500 1500 3/3.25 48 HDG/Powder coated
RS-S-1000 1000 3/3.25 48 HDG/Powder coated
RS-S-500 500 3/3.25 48 HDG/Powder coated
The Ledgers(Horizontals)
Code Effective Length(mm) Tube Thickness(mm) Tube Diameter Surface Treatment
RS-L-2000 2000 3/3.25 48 HDG/Powder coated
RS-L-1770 1770 3/3.25 48 HDG/Powder coated
RS-L1000 1000 3/3.25 48 HDG/Powder coated
The Diagonal Brace
Code Length(mm) Tube Thickness(mm) Tube Diameter(mm) Surface Treatment
RS-D-2411 2411 3 48 HDG/Powder coated
RS-D-2244 2244 3 48 HDG/Powder coated
The bracket
Code Length(mm) Tube Thickness(mm) Tube Diameter(mm) Surface Treatment
RS-B-730 730 3 48 HDG/Powder coated
Plank
Code Effective Length(mm) Width(mm) Height(mm) Surface Treatme
GP-2050 2050 480 45 HDG
GP-1820 1820 480 45 HDG
GP-3000 3000 240 45 HDG
GP-2000 2000 240 45 HDG
GP-1000 1000 240 45 HDG
Hollow Head Jack And Jack Base
Code Length(mm) Tube Diameter(mm) Size of Plate(mm) Surface Treatment
JB-H-60038 600 38 150*120*50*4 HDG
JB-B-60038 600 38 150*150*4 HDG
Standard
Loading Ability of ringlock steel scaffolding
No. Items Vertical Size Vertical Load on One Standard Vertical Load on Four Standards Summary
1 RINGLOCK STANDARD 2000*48*3.25MM About 86KN(8.77tons) Max load 346KN(35.3tons) This system loading capacity is 173KN(17.6tons) per square meter .
No. Items Horizon Size Horizon Load on One Ledger
2 RINGLOCK LEDGER 2000*48*3.25MM Max load 5.9KN(0.6ton)
3 RINGLOCK LEDGER 1000*48*3.25MM Max load 11.7KN(1.2tons)
No. Items  Size Average Load Capacity
4 STEEL PLANK 2000*240*45*1.6MM About  2KN(0.2ton)

Painting & Coating
Lightly oiled, Hot dip galvanized, Electro galvanized, Black

Packing & Loading
Plastic plugs in both ends, Wrapped in waterproof paper or PVC sleeve, and sackcloth with several steel stripsPlastic plugs in both ends.
Related Products
Service
Certification and testing as per clients need
Third party inspections and approval
Inventory management as per clients
Logistics arrangement for client to help in cost cutting
Related Projects
Mining
2022-08-02 10:43:56
Mining
Canada Petroleum Pipeline Project
2024-09-23 09:51:58
Canada Petroleum Pipeline Project
standard:ASTM
Surface :1. Galvanized 2. Black and Color Painting
Energy Transmission Project
2024-05-30 10:25:02
Energy Transmission Project
standard:ASTM
Surface :1. Galvanized 2. Black and Color Painting
Inquiry
Copyright © Gnee Steel (tianjin) Co., Ltd All Rights Reserved.
Support: Coverweb